Construction Monitoring Request
EXISTING PROJECTS ONLY:
Only use this form if Stanley Gray have completed design work on the project.
If not please email info@stanleygray.co.nz with job details.
Site Address:
*
Today's date
Company Name:
Name of Person Submitting Request:
*
Email Address:
*
Bill Payer for Construction Monitoring:
*
Email Address if different to above:
Name of Site Contact:
*
Site Contact Email Address:
*
Phone:
*
Type of Request:
*
Subgrade (Pre-Hardfill)
Timber Pile Driving
Pre-Pour for Concrete Augered Piles
Hardfill / Fill Compaction
Grade B Blockwork
PS4 only (inspection already carried out)
Other
Other
Has Topsoil been removed?
*
🛈
Yes
No
No
By selecting "Yes", you are
confirming
that this property
is ready for inspection
Date of Topsoil Removal?
*
+
Start Date of Earthworks?
*
+
Date of Pile Driving?
*
+
Pile Driving Company
*
Estimated Date of Inspection:
*
+
Is a 2nd Inspection Required?:
*
Yes
No
Type of Request:
*
Subgrade (Pre-Hardfill)
Timber Pile Driving
Pre-Pour for Concrete Augered Piles
Hardfill / Fill Compaction
Grade B Blockwork
Other
Other
Has Topsoil been removed?
*
Yes
No
No
Date of Topsoil Removal?
*
+
Start Date of Earthworks?
*
+
Date of Pile Driving?
*
+
Pile Driving Company
*
Estimated Date of Inspection:
*
+
Urgency
*
Very High (immediate, within 24 hours) urgency surcharge will apply
High (48 hours notice)
Medium (within a week)
Low (weather permitting)
Inspection already carried out
Other:
Other:
BC Number:
*
Has consent been granted?
*
Yes
No
Upload stamped drawings: (Must be uploaded if this is for 1st Construction Monitoring Request)
Is the PS4 to be sent to the above entered email address?
*
Yes
No
Email Address for PS4 to be emailed to:
*